The government of India has set a target of installing 40 GW of grid-connected rooftop solar (RTS) power by 2022. To accelerate deployment, states and union territories have enacted net metering policies for RTS. However, with an installed capacity of only 2,141 MW thus far, the grid-connected RTS sector is struggling to scale as expected, leading us to question the efficacy of the RTS policy framework.[1] Net metering policies have failed to sufficiently stimulate this sector. Inefficiencies in some of these policies have resulted in poor uptake of RTS. This analysis identifies the technical and commercial inefficiencies and recommends a way forward. Technical inefficiencies make net metering less economically viable for non-residential consumers, while commercial inefficiencies pose a deterrent for Indian consumers seeking value for money. This has resulted in the limited adoption of RTS by both residential and non-residential consumers.

Technical inefficiencies in net metering policies

Commercial and industrial (C&I) consumers contribute nearly 51 per cent of the total electricity demand in India.[2] Therefore, in the diverse energy systems landscape, for a regulation like net metering to be successful, it is important that installing an RTS system makes business sense for C&I consumers. However, policy restrictions on system size and grid integration often discourage C&I consumers from transitioning to RTS. For instance, most regulations limit RTS system size to under 1 MW at the very most (and 1 kW at the very least), and also cap the system capacity with respect to the total sanctioned load (often between 80 to 100 per cent). Such restrictions on system size reduce the economic viability of RTS, as a 1 MW RTS system can only produce 1.3 to 1.4 million units of electricity per year, while the energy requirements of some C&I consumers could be much higher. In response, regulators base their argument on two points, first that these restrictions are put in place to ensure that the discoms do not forego their revenue from C&I consumers as it is used to cross-subsidise electricity for agricultural and residential consumers and second, that consumers with greater requirements should procure power through the open access mechanism (i.e. a mechanism which allows customers to buy cheap power from open market) to meet their excess demand. However, the recent precedent set by the Maharashtra Electricity Regulatory Commission (MERC) in the case between Cleanmax Enviro Energy Solutions Pvt Ltd v. Maharashtra State Electricity Distribution Company Limited suggests that net metering and open access are two separate arrangements and cannot be availed simultaneously by the same consumer due to challenges related to grid security, accounting, billing, settlement, etc.[3] This has left several consumer segments dissatisfied with the current RTS regulations, and a large share of roof space remains underutilised which could have otherwise supported rooftop installations in the industrial consumer segment.

Further, RTS proposals are approved based on transformer capacity in the area. This analysis finds that 17 states allow a cumulative RTS capacity addition of up to 50 per cent of the transformer capacity, incentivising early adopters and disqualifying other applications based on infrastructure constraints. Notable exceptions are the states of Jharkhand and Tamil Nadu, which allow a cumulative RTS capacity addition of 100 and 90 per cent of the transformer capacity, respectively. However, a simulation-based study shows that cumulative RTS installations of about 55–75 per cent of the distribution transformer capacity can be implemented without having to undertake any measures to contain voltage problems or overloading.[4] The transformer capacity limit set by a few states is too conservative. Detailed technical due diligence by the Central Electricity Regulatory Commission (CERC) could help establish the right standards for states, making it easier for consumers to navigate the policy from a regulatory standpoint.

Commercial inefficiencies in net metering policies

Transitioning to RTS is a giant leap for many Indian consumers, especially because of its high upfront costs and consumers’ conservative approach while making investment decisions.[1] A residential household will shift to RTS only if they get higher than market returns on their investment. However, in certain states, RTS policies are unable to provide consumers adequate financial incentives. For instance, in 11 states, no incentive is provided to consumers who produce more power than they consume or be prosumers. In cases where the export of excess electricity is allowed, states may compensate consumers at the state average power purchase cost, which varies from INR 2.29/kwh to INR 4.12/kwh for most states, and is often lower than the tariff at which consumers (especially non-residential) buy power from the grid. Such provisions increase the payback period for RTS investments, making it less attractive for consumers. In response to this, regulators often argue that these restrictions ensure the financial health of discoms, but studies at CEEW suggest that innovative business models can make RTS profitable for both discoms and consumers. 

Regulatory inefficiencies in net metering policies

Lastly, we also found that for a few states, certain parameters are not specified in the regulation which creates ambiguity in the operating procedures and leaves considerable scope for individual discretion at the executive level of SERCs and discoms. This regulatory inefficiency makes it difficult for consumers to make an informed choice. This exacerbates the problem of low rooftop solar adoption due to lack of familiarity with the product, and the regulatory barriers, which together are prohibitive in many cases. In addition, procedural issues such as delays in approving applications, site inspection requirements, scarce availability of net meters, delays in subsidy payments, and low transparency discourage consumers from transitioning to RTS. 

The way ahead

Model regulations for net metering were introduced in 2013 to promote power generation from renewable energy sources, particularly RTS. However, even after six years, certain technical, commercial, and regulatory gaps exist. From the technical standpoint, the central and state governments should redesign the regulations and focus on lifting the excessive restrictions on system size, sanctioned load, and on grid integration as they are leading to technical inefficiencies. It is time that we learn from past experiences and correct our future course. Certain recommendations to this effect are:

  • The states should restrict system size based on the sanctioned load and distribution transformer capacity, but should relax the limits when compared to existing regulations. For instance, the allowed system size should be X times (>1) when compared to the sanctioned load and can be state specific. In addition, a detailed technical study is required to estimate the maximum load that can be connected to the distribution transformer. The above recommendation will be a win-win for both the consumer and discom and will reduce the need for other restrictions.
  • From the commercial standpoint, tax benefits under Section 80C of the Income Tax Act, 1961, and other such tax incentives for consumers of RTS systems should be explored. The government has adopted a similar approach to support the scale-up of electrical vehicles in the country and the same can be tailored to RTS.

RTS has huge potential in India as it offers significant cost savings. However, some aspects of existing regulations limit the commercial attractiveness of RTS for consumers. Countries look up to India when designing regulations for utility-scale solar power plants, and it is now time for India to take the lead in the global transition towards distributed solar generation as well, by learning from its past and designing effective policies which can be scaled up.

More on rooftop solar by CEEW-CEF

  1. For a more deeper insight, refer to our issue brief analysing the key trends of RTS policies across Indian states.
  2. Check out our in-house developed web tool that compares RTS policies on key parameters across Indian states.

Do you think net metering regulations have been successful in achieving their potential? What should the way forward be? Share your views and comments on the above CEF analysis, issue brief and web-tool at [email protected]

Table 1: Insights from net metering policies of Indian states

References


11 People Liked
Author's Name
Rishabh Jain
Senior Programme Lead
For queries reach out to author
Posted On
06 November 2019
Tags
Energy Transition
DRE
State Policy
Net-Metering
Gross metering
Share
PUBLICATIONS
Renewable Energy
July 2019
2 mins read
Selna Saji
CEF EXPLAINS
Renewable Energy
+ 1 More
June 2019
2 mins read
Nikhil Sharma
CEF ANALYSIS
Instruments & Regulations
+ 1 More
June 2019
1 mins read
Sugandha Somani
CEF ANALYSIS
Others
April 2023
1 mins read
Amlan Bibhudatta
CEF ANALYSIS
Industrial Decarbonisation
+ 1 More
June 2022
5 mins read
Nikhil Sharma
CEF ANALYSIS
Industrial Decarbonisation
+ 1 More
February 2022
7 mins read
Harsha V Rao
CEF ANALYSIS
Instruments & Regulations
+ 1 More
March 2020
4 mins read
Nikhil Sharma
CEF ANALYSIS
Others
+ 1 More
October 2021
2 mins read
Saloni Jain
CEF ANALYSIS
Electric Mobility
December 2020
7 mins read
Meghna Nair