STATE
Chandigarh is the city capital of Punjab and Haryana, as well as an independent union territory with a population of 1.1 million. The city has well-developed social and physical infrastructure. Chandigarh is the only union territory with more than 90% of developed area with only 2% people living in villages.
Installed Solar Capacity
Electricity Generation from Solar
Net Metering Policy
System size and grid integration
  • LT single phase
    < 10 kW
    LT three phase
    10 kW–100 kW
    HT
    Above 100 kW
  • Maximum capacity w.r.t sanctioned load
    100%
Key Players
  • Acme Solar Holdings
  • Adani Green Energy
  • Avaada Energy
  • Azure Power
  • Greenko Energy Holdings
  • Hero Future Energies
  • NLC
  • NTPC
  • Renew Power
  • Tata Power
  • Amplus Solar
  • Azure
  • Cleanmax Solar
  • Fourth Partner
  • Oakridge Solar
  • Renew Power
  • SunSource
  • Tata Power Solar Systems Ltd.
  • Think Energy
  • Vivaan Solar
  • DBS
  • ICICI Bank
  • IDFC
  • IREDA
  • PFC
  • Punjab National Bank
  • SBI Caps
  • State Bank of India
  • Sunvest Capital
  • Yes Bank
  • Abu Dhabi Investment Authority (ADIA)
  • Actis
  • APG Asset Management NV
  • Canadian Pension Fund
  • Engie SA
  • GIC Private Limited
  • JERA, Japan
  • Piramal Enterprises
  • Emmvee Photovoltaics Private Limited
  • Goldi Green Technologies Pvt. Ltd.
  • Mundra Solar
  • Navitas Green Solutions Pvt. Ltd
  • Renewsys
  • Satvik Green Energy Pvt Ltd
  • Tata Power Solar Systems Ltd.
  • Vikram Solar
  • Waaree Solar
  • ABB LTD
  • Bosch
  • First Solar
  • L&T ECC
  • Mahindra Susten
  • Moser Baer Ltd
  • Punj Lloyd Delta Renewables Pvt Ltd
  • Sterling & Wilson
  • Sunsure
  • Vikram Solar
  • Asea Brown Boveri Ltd (ABB)
  • Delta Electronics India
  • Fronius India Pvt Ltd
  • GoodWe
  • Huawei
  • SMA India
  • Sofar Solar
  • Solis
  • Sungrow
  • Toshiba Mitsubishi-Electric Industrial Systems Corporation (TMEIC)
Graphs have been developed using HIGHCHARTS software under the Creative Commons Attribution-NonCommercial 3.0 License
Key Indicators
  • State solar target
    153 MWp
    By MNRE for 2022
  • Installed solar capacity (November 2020)
    43 MW
    Ranked 20th in India
  • Solar projects installed in 2019-20
    6 MW
    Ranked 18th in net addition
  • Share of state in 2019-20
    0.02 %
    in electricity generated from solar in India
  • Installed capacity of grid connected rooftop
    34 MW
    as of March 2020
Applicable GST Rates
Indirect Taxes
BIS Certified Solar Modules